• Electrical Insulation Diagnostics.

  • Applied Voltage Tests and Partial Discharges Measuring (PD) to high and medium voltage buried (underground) cables in situ. This is performed after cable installation, applying AC voltage and utilizing resonant system equipment.

  • Applied Voltage test and Partial Discharges Measuring (PD) to encapsulated substations GIS in situ after installation with AC voltage utilizing resonant system equipment.

  • High and medium voltage underground (buried) cable system and encapsulated substations on-line partial discharges monitoring.

  • On-line partial discharges monitoring that allows:
      -An energized installation continue or ambulatory monitoring.
      -Probing of fault evolution at anytime.
      -Remote diagnostic during real time assisted by qualified personnel.
      -Diagnostic service and report performance (collected data analysis, installation diagnostic, and delivery of results report).

  • Applied Voltage test and Partial Discharges Measuring (PD) to medium voltage buried (underground) cables in situ. This is performed after cable installation applying AC voltage and utilizing VLF.

  • Qualification tests on medium and high voltage cables according to the Spanish norms (UNE norms) and its international equivalents: IEC 60840 / IEC 60502 / IEC 62067 / AEIC CS-9 / ICEA S-108-720, in the Official Central Laboratory of Electrotechnia (LCOE for its abbreviation in Spanish) which is certified and recognized on this field.

  • Thermal Cycling tests on high voltage cables of up to 220kV.

  • Calibration and test on high voltage equipments with certificate generations and reports under the ISO 17025 norm.

HVTEST © 2014 | Aviso de Privacidad |  phone number: +52 44 99 63 61 51